The weaving and installation process for the TBC head office building is being handled by Sakcable production.
“Due to the large scale of the project, with the building consisting of four main sections, more than 20 types of cables were used. The project required licensed products of European standards, which Sakcable fully meets.”Schneider Electric” automatic switches and electrical fittings will be used in the building’s interior”, – Levan Mshvildadze, the creator of engineering drawings for “Euro Montage”.